Monday, June 22, 2009

Hazard - Tarlton - Mosely streets

There is an edge of bitumen to the kerb that is 20 to 60 mm high and in line with direction of travel. This edge will "trip" a cyclist and cause them to fall into the path of passing vehicles.
 
Please remove this hazard on Tarlton St, heading North, near Mosely street.

Regards

Administrator
www.roadrepair.wikispaces.com

Anzac Highway - North side to Marion Rd



Press play to view video


This is typical of the surface in bike lanes in Adelaide.

Anzac Highway - Kerb to Bitumen




Press play to view video


This edge is typical of bike lanes on Anzac Highway and around Adelaide


Previously reported to Dept of Transport 15 November 2008. See report:
http://roadrepair.blogspot.com/2008/11/anzac-highway-bike-lane-west-of-beckman.html


Video on CD posted to Director of Road Safety (Martin Small) and delivered to City of Holdfast Bay 23 June 2009.






^^^^^^^^^^^^^^
Letter to Director of Road Safety DTEI

^^^^^^^^^^^^^^^^^^^^^^

Letter to Holdfast Bay City Council



.

Delays to remove hazard of service covers

As with all sunken or faulty service covers reported to United water, they
are slow to remove the hazard, often not removing the hazard at all.

For more examples, go to www.roadrepair.blogspot.com and click on the label
in the right column: "United Water".

Wednesday, June 17, 2009

King George SIP - Reported to Maria Kourtesis JP, May 2009

This Service Inspection Point (SIP) cover is sunken in excess of 30mm (the ruler is green for 20mm, then red).














The sunken Service Inspection Point (SIP) will cause damage and personal injury. A cyclist changing direction to avoid the SIP is at risk of colliding with a passing vehicle. Drivers are also aggravated by having to drive slowly behind a cyclist who is in the way.

Being on a corner, this SIP is a hazard for a cyclist attempting to indicate a turn (one handed).

Reported to Maria Kourtesis JP (Liberal Candidate for Bright) at a street corner meeting at the corner of Harrow and King George streets.

The challenge was set to have the hazard removed. This was in the context of the issue that these hazards are NOT attended to, even if reported. See the topic "United Water" (click to view).

Here is a video of a cyclist negotiating the corner and SIP.

(Click on the PLAY button to start)

King William St - 4 weeks - No action

This hazard was brought to the attention of the Deputy Lord Mayor of Adelaide, Stephen Yarwood, at a Capital City Forum held on Friday 15 May.

The topic was "Cycling Towards a Healthy and Sustainable Community".

Other attendees were:
Minister for the City of Adelaide, Dr Jane Lomax-Smith
Keynote speaker - Associate Professor Chris Rissel
Director of Road Safety, DTEI
Dr Ian Radbone
Andrew McEvoy, CE, SA Tourism Commission

There is something wrong if a hazard report to this audience does not get fixed in less than one month.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

23 June 2009
Email sent to City@Adelaidecitycouncil.com for the attention of Stephen Yarwood, Deputy Lord Mayor

.

Friday, June 12, 2009

Anzac highway - Other cyclists issues

Here is a link to another person's viewpoint regarding Anzac Highway.

http://www.adelaidecyclists.com/forum/topics/anzac-hgwy-commuter-cleaned-up

"Aptly named anzac highway, as it is an ongoing battle."

Sunday, June 7, 2009

Murray Tce - Service Inspection Points (SIPs)



The video shows the impact that a sunken service cover has to a cyclist. This bicycle is a mountain bike with front suspension. The impact to a road or tourer bike is more severe.

In addition to the risks of injury or property damage on impact, there is a risk of collision from passing vehicles not expecting a cyclist to change position on the road to avoid impact with an SIP.

Letter to United Water:


29 Sept 2008

The Service Inspection Points (SIPs) shown in this video (38 Murray Tce, Oaklands Pk) have not been corrected. There were two down the road that have been raised, but no action to fix these.

United water Service have been contacted today (8381 0300) and the sip at 38 Murray Tce reported (Job Number W1162287).

Friday, June 5, 2009

Edge of bitumen - Sturt Road

Hello (mail@holdfast.sa.gov.au)
Please view this video of a cyclist tackling the 30mm edge of bitumen at the edge where the kerb and the bitumen meet.
This is in many places on Sturt Rd. The video is taken between Morphett and Brighton Roads heading West.
As stated on the blogsite "The edge of this bitumen will "trip" a cyclist up and throw them onto the road, in front of the passing traffic."
Please take the necessary action to remove this hazard at all sections of Sturt road.

--

Regards

Administrator
www.roadrepair.wikispaces.com

Sturt Road - Edge of bitumen to kerb

The edge of this bitumen will "trip" a cyclist up and throw them onto the road, in front of the passing traffic.

See other "edge of bitumen" reports on the Ride Out Loud blogsite.

Thursday, June 4, 2009

FW: Hazard. 181 Esplanade

-----Original Message-----
Sent: Friday, 5 June 2009 4:00 AM
To: mail@holdfast.sa.gov.au
Subject: Hazard. 181 Esplanade

Photo attached

FW: Hazard. 50mm deep. Cnr Esplanade and wheatland

-----Original Message-----
Sent: Friday, 5 June 2009 3:03 AM
To: mail@holdfast.sa.gov.au
Subject: Hazard. 50mm deep. Cnr Esplanade and wheatland

Image attached

Tuesday, June 2, 2009

Irregular Kerb edge in Bike Lane - Anzac Hwy

Reported to Department of Transport 1800 018 313 (road and traffic light report hotline).

See also the discussion on Ride Out Loud blogsite.

Service Cover - Greenhill - Unley Rds - Bike Lane

Reported to Department of Transport 1800 018 313 (road and traffic light report hotline)

See also discussion on the Ride Out Loud blogsite.

Monday, June 1, 2009

Fwd: Hazard.Corner Addison ~ Struan. 50 mm

---------- Forwarded message ----------
Date: 2009/6/1
Subject: Hazard.Corner Addison ~ Struan. 50 mm
To: council@marion.sa.gov.au

Image attached

Tuesday, May 26, 2009

FW: Hazard. Tree 124 South tce

Reply from Adelaide Council 26 May 2009...

"Thank you for reporting this hazard which is being processed.
The reference number for your request is 927397"



---------- Forwarded message ----------
Date: 2009/5/26
Subject: Hazard. Tree 124 South tce
To: city@adelaidecitycouncil.com


124 South Tce. The Branch hangs low and as i cycled under it vast night (no parked cars ) it hit my helmet and broke my helmet light. There is also a risk of collision with a passing car who would not expect a cyclist to change line of travel to avoid, or as a result of, hitting branches.

 


Regards

Administrator
www.roadrepair.wikispaces.com



Tuesday, May 19, 2009

Hazard. Railway Tce Sth - Video footage

 
The section of Railway Tce South from Goodwood Rd to Devo Tce South is very poor and a hazard to cyclists. There are many rough patches, and a cyclist that stikes the rough patch, or avoids the rough patch, is at risk of collision with a passing vehicle..
 
Here is a link to a video of that section.
 
Please contact me in regards to the action you will take to remove the hazard to cyclists.

Regards

Administrator
www.roadrepair.wikispaces.com


 
---------- Forwarded message ----------
From: <roadrepair@gmail.com>
Date: 2009/5/16
Subject: Hazard. Railway Tce Sth
To: pobox1@unley.sa.gov.au
Cc: roadrepair@gmail.com


Corner Railway tce Sth and Devo St Sth




Fwd: Hazard - Cnr Kildonan and Winton

From: Road Repair Australia
Date: 2009/5/20
Subject: Hazard - Cnr Kildonan and Winton
To: council <council@marion.sa.gov.au>


 
Please find attached a photo of a pothole at the corner of Kildonan and Winton Ave Warradale.

Please contact me if i can provide any further information regarding this hazard.

Regards

Administrator
www.roadrepair.wikispaces.com

Corner of Winton and Addison Rds 3030da

Travelling West on Addison (Brighton East BikeWay), then turning into Winton Ave, the road is very rough and hazardous to ride over.

Reported by email to Marion Council (council@marion.sa.gov.au).

Also reported is the BikeWay sign to turn at Winton is missing.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^66

Copy of email:

from Road Repair Australia to council <council@marion.sa.gov.au>
date 20 May 2009 13:14
subject Hazard - Corner of Addison and Winton

Hello <council@marion.sa.gov.au>

When travelling West on Addison Rd, the road surface at the corner of Addison Rd and Winton Ave is very uneven and hazourdous for cycling. This corner is part of the Brighton East BikeWay. A cyclist impacting the bumps, or avoiding the bumps, will change direction unexpectedly and may collide with a passing vehicle.

Please also note the BikeWay sign is missing at this corner.

A video of the area is posted here:http://roadrepair.blogspot.com/2009/05/corner-of-winton-and-addison-rds-3030da.html

Please contact me in regards to your actions to remove the hazard and to replace the sign.

Regards
Administrator
www.roadrepair.wikispaces.com

Lewis St SIPs

Heading West on Lewis St, South Brighton, there are two Service Inspection Points (SIPs) that exceed 30mm in height variation (sunken).

Reported to United Water (8381 0333) job number W1106221.

Railway Tce South - Goodwood

The section of Railway Tce South, from Goodwood Rd to Devo St South is very poor.


Here is a video of this section of the road. A cyclist hitting, or avoiding the rough patches is at risk of being hit by a passing vehicle as the driver would not expect a sudden change in the line of travel. Also, drivers become aggravated having to go slow because of a cyclist in the way.



Below is the original email and photo regarding one pothole at the corner of Railway and Devo.



-----Original Message-----
Sent: Saturday, 16 May 2009 8:17 PM
To: pobox1@unley.sa.gov.au

Subject: Hazard. Railway Tce Sth

Corner Railway tce Sth and Devo St Sth

Friday, May 15, 2009

Water Hazard - Railway Tce Warradale

This is near Morphett/Diagonal Road.


The water forces a cyclist to move onto the road. Drivers on Railway Tce do not expect this move and it may cause a collision or aggravation with the driver.




Email sent to council@marion.sa.gov.au 16 May 2009.

Trees and water hazard - Mitchinbury Tce Marion

The trees and the water forces a rider to move onto the road.

This is not expected by drivers and may result in a collision or aggravation.



Email sent to council@marion.sa.gov.au 16 May 2009

Cromer Prd Millswood

This is a signposted as a cycleway for Unley Council.

These hazards force a cyclist to move across the road. Drivers do not expect this and it may cause an accident with a vehicle or agravation with the driver.




Email sent to pobox1@unley.sa.gov.au 16 May 2009








































Wednesday, April 29, 2009

Hazard. 126 unley rd Unley

---------- Forwarded message ----------
From: Road Repair Australia
Date: 2009/4/30
Subject: Hazard: 126 unley rd
To: pobox1@unley.sa.gov.au

Hello

Please remove the hazard for cyclists in this cycle lane at 126 Unley Rd (photo attached).

The ruts will trip a cyclist, causing them to fall onto the road.

Regards

Administrator
http://www.roadrepair.wikispaces.com/

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

from Unley Council
date1 May 2009subject Emailing: dwa168.htm
Reply
Thank you for concerning this bicycle lane hazard. This road ( Unley Road) is belong to Transport S.A. and please refer this issue to them. We ( Unley City Council ) only repair kerb/watertable and roads that has a NAASRA Rating from 6 to 8. Unfortunetly, Unley Road's NAASRA Rating is 5.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

5 May 2009

Phoned Transport SA 1800 018 313 (road and traffic light report hotline)

Michael to advise road crew.

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^


Hazard. Esplanade Glenelg South

 
The road surface next to the kerb repairs needs attention to remove the hazard to cyclists.
 
The edge of the bitumen (up to 60mm deep) will trip a cyclist up, causing them to fall onto the road and into the path of traffic.
 
This area has been under repair since Jan 2009 and while the unsealed surface was ok during summer, with rain the whole section is now hazardous.

As a minimum please fill and compact the area next to the kerb repairs.
 
To remove the hazard please reinstate the bitumen.-

Regards

Administrator
www.roadrepair.wikispaces.com

---------- Forwarded message ----------
From: Road Repair Australia <roadrepair@gmail.com>
Date: 2009/1/21
Subject: Excellent fill at kerb repair site
To: mail@holdfast.sa.gov.au



This is an excellent example of correct fill after kerb repairs and before the bitumen is reinstated.

The hazard to cyclists is reduced because:
- The surface of the fill is compacted well and narrow bike tyres do not sink into the gravel
- The fill height is level to the edge of the bitumen and is also well compacted at the edge
- There is minimal loose gravel in the gutter or on the road

The delay to have the bitumen reinstated here has been lengthy, but the hazard has been minimised with the effort made when filling and compacting the area.

The area may require some maintenance in patches in the event of rain or further delays to reinstate the bitumen, however deterioration will be slower.

Please pass on my thanks to the staff or contractors. I am sure all cyclists are greatful.
Regards
Administrator
www.roadrepair.wikispaces.com

Monday, April 27, 2009

Hazard - Repeated - Storm water cover

To Mail HOLDFAST <mholdfast@holdfast.sa.gov.au>

The storm water cover on the corner of Jetty and Brighton Rds Glenelg was
dislodged again when i went past at 7.00pm last night.

For more information about the repeated reporting of this drain cover CLICK HERE.


Regards

Administrator
www.roadrepair.wikispaces.com


-quoted text -
---------- Forwarded message ----------
From: <roadrepair@gmail.com>
Date: 2009/4/24
Subject: Hazard. Repeated
To: mail@holdfast.sa.gov.au

Storm water cover dislodged again. Corner Jetty and Brighton roads Glenelg.

--

Regards

Administrator
www.roadrepair.wikispaces.com

Hazard - Repeated - Anzac Hwy bike path - Cnr Grove Ave

Hello (mail@holdfast.sa.gov.au)

No repair has been made to remove the hazard and the cage that was
surrounding the hazard is now gone (again).

This was first reported 12 February 2008

See previous correspondence here:

--

Regards

Administrator
http://www.roadrepair.wikispaces.com/

Thursday, April 16, 2009

What Adelaide roads do to your wheels...

This was not from one single impact, but continuous impacts from:
- service covers
- pot holes
- poor road surface conditions

Monday, April 6, 2009

Fwd: Hazard. Stormwater cover. Again

---------- Forwarded message ----------
Date: 2009/4/7
Subject: Hazard. Stormwater cover. Again
To: mail@holdfast.sa.gov.au


Cnr Jetty rd and Brighton rd glenelg. The cover has collapsed again.


Regards

Administrator
www.roadrepair.wikispaces.com